Hot Dip Galvanising Plant Planning

Hot Dip Galvanising Plant Planning

  • Requirement Analysis
  • Logistics & production master planning
  • Material stream planning
  • Layout planning
  • Submission planning
  • Cost efficiency Analysis
  • Financing
  • Production planning
  • 3D Simulation
  • Process technology
  • Hall planning
  • Safety concept & risk analysis

Individual project and submission planning
In order to ensure plant success, the correct decisions must be made at the beginning of any project. Therefore, from the outset INGENIA provides its clients with a personal project manager with whom an initial evaluation of the specific requirement situation is carried out. This results in the first fundamental consequences for the layout and the technical features of the galvanising line.


The in-house INGENIA Assembly & Experimental Plant test unit
INGENIA’s in-house testing unit already provides all the necessary information and a practice-related overview of the subsequent galvanising line production sequence during the preliminary project phase. The advance testing of prototypes and systems not only guarantees maximum efficiency, but also an exceptionally high degree of investment security. 

INGENIA also undertakes the preparation of complete documentation in a form suitable for the authorities for procedures such as project submissions or any environmental compatibility Audits.


Precise material stream planning and simulation
The identification and harmonisation of all process sequences are essential for an optimum galvanising line concept. Ideally, these take place prior to the beginning of line realization for only thus can maximum output and the best possible cost-benefit ratio be achieved.